• Menu
  • Skip to primary navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Akeso&Co Logo

Delivering innovative solutions to the healthcare & lifescience industry

Header Right

Consulting Services: 020 3011 1381
NHS Supply Chain: 01925 692 028
enquiries@akesoco.com
  • Facebook
  • Instagram
  • LinkedIn
  • Twitter
  • Home
  • About
  • Expertise
  • Case Studies
  • Insights
  • Careers
  • Contact
  • Home
  • About
  • Expertise
  • Case Studies
  • Insights
  • Careers
  • Contact

Virtual Wards: First-of-kind case study on Heart Failure

December 21, 2022 //  by Rianna

Summary

One of the first datasets of its type, pioneers within technology-enabled virtual wards West Hertfordshire Hospital in partnership with Masimo, used hospital grade digital health platform, Masimo SafetyNet to establish a robust clinical pathway to support early discharge and readmission avoidance for patients with heart failure. Key findings include, 36% reduction (3 days) in average acute LoS, 38% reduction in readmission and excellent patient satisfaction.

Background

Following the call by NHS England for ICSs to embrace innovation and establish technology-enabled Virtual Wards, a first-of-kind study has been released by early pioneers at West Hertfordshire Teaching Hospitals NHS Trust who have developed a Heart Failure Virtual Hospital using leading digital health platform, Masimo SafetyNet®.

Designed by a local Integrated Care Service consisting of representatives across the Acute Trust, Community Heart Failure Services and primary care, the West Hert’s Heart Failure Virtual Hospital was established to allow patients to safely receive care from the comfort of their home. In doing so, a study was conducted to quantify how this technology-enabled Virtual Ward could (1) safely reduce acute length of stay through early discharge and (2) deliver high patient outcomes through preventative readmission, all whilst maintaining positive patient experience.

To establish the Heart Failure Virtual Hospital, West Hert’s in partnership with technology providers, Masimo, developed a comprehensive clinical pathway and platform customised for eligible patients. At the centre a Virtual Hospital monitoring hub was formed to collate and monitor patient data, sent directly via Bluetooth from the Masimo monitoring app on the patients mobile device. Automated vital signs readings were recorded three times per day, as well as daily questionnaires and phone calls by a Virtual Ward nurse and daily Virtual Wards rounds by a heart failure consultant.

Key outcomes

The study, which is the first datasets of its type, collated data across length of stay, readmission rate and patient experience for 183 patients. Preliminary analysis collated the following key findings:

  1. Acute length of stay was significantly reduced through early discharge
    • 36% reduction (3 days) in average acute LoS – mean acute LoS was 5.8 days compared to 9.1 days for patients not onboarded into the Virtual Ward for the same period
    • 68% of patients (125) were successfully discharged after a Virtual Ward stay
  2. Preventative readmission indicated strong decline
    • 11% reduction in readmission rate into the acute following 30-day follow-up with a primary HF diagnosis – 3.2% for Virtual ward vs. 3.6% for non-Virtual Ward group
    • 38% reduction in readmission rate for all causes – 9.6% for Virtual Ward vs. 15.5% for non-Virtual Ward group
  3. Patient satisfaction was excellent
    • 83% of patients agreed that going home sooner from hospital aided their recovery
    • 85% of patients agreed that they felt safe as a patient in the Virtual Hospital
    • 88% of patients agreed that the frequency of contact and communication by the monitoring hub was about right.

Key success factors for implementation

  1. Robust technology – Hospital grade technology that is both compliant and from a recognised and trusted provider, is a key driver to overcoming the potential barrier of both Clinician and patient acceptability. Due consideration should be given to the user experience and journey so to empower the patient and Clinician.
  2. Clear methodology – As with any large clinical transformation which involves adoption of new technology, a clear plan that reflects a comprehensive understanding of the problem to be addressed is crucial. This includes identifying the appropriate use case and patient cohort.
  3. Pilot approach – Avoid a ‘big bang’ approach. We recommend phasing Virtual Wards in, targeting two or three patient cohorts of highest priority / acceptability first.

How can we help you?

Masimo SafetyNet® is a Digital Health platform from Masimo, whose innovative monitoring products have been in use across the NHS for over 15 years, with a proven track record of success.

Key features of Masimo SafetyNet® include:

  • Continuous and spot check sensors to monitor patient vital signs remotely via Bluetooth connectivity in real-time
  • Over 150 live Customisable care programs, including training and educational material
  • Secure NHS NDG compliant network via AWS cloud, enabling 24/7 two-way audio and video communications with the capability for EMR integration
  • Dynamic dashboard and customisable alert limits to automatically notify and inform Clinicians as required

Masimo has a vision to support healthcare providers deliver effective and safe patient care from the comfort a patient’s home through hospital grade technology-enabled Virtual Wards. To support providers in rapidly implementing Virtual Wards, Masimo in partnership with Akeso have developed a suite of documents to achieve their goals, whilst ensuring quality patient care.

To access Masimo and Akeso’s free implementation guide for Virtual Wards, please click here, or get in touch with us on Martin.Shiderov@Akesoco.com

Category: Case Studies, Technology

Previous Post: « Technology-enabled virtual wards the future of healthcare
Next Post: Delivering improvements to discharge practices »

Primary Sidebar

Latest news

Celebrating Women Leaders in the Workplace on International Women’s Day

March 8, 2023 //  by Rianna

Pro-bono COVID-19 Grant Application Support to Homerton Healthcare Hospital Foundation Trust as the Lead Charity for North East London ICS

January 19, 2023 //  by Rianna

Delivering improvements to discharge practices

January 10, 2023 //  by Rianna

Follow us

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

Footer

Please get in touch

For Akeso & Co. Consulting Services in London
please call 020 3011 1381

For NHS Supply Chain in Warrington
please call 01925 692028

Our London office:

11 Cursitor Street
London, EC4A 1LL

Our Warrington office:

Wilderspool Park, Greenalls Avenue
Stockton Heath, WA4 6HL

Email Akeso & Co.

For Akeso & Co. Consulting Services please email enquiries@akesoco.com

For any enquiries relating to NHS Supply Chain please email akeso@supplychain.nhs.uk directly

Site Footer

  • Facebook
  • Instagram
  • LinkedIn
  • Twitter

Copyright © 2023 Akeso & Co. · All Rights Reserved